Case Studies
Coffee Roasting Diedrich Coffee, Inc. Maximus Coffee Group
Medical Devices and Instruments Anspach Effort, Inc.
Electrical Equipment Sumitomo Electric Lightwaves
Truck Equipment Knapheide Truck Equipment
Unique Operations Ancestry.com

Coffee Production

Diedrich Coffee, Inc. took a lot of time scheduling production with Excel spreadsheets. See how Diedrich gained more efficiency with greater visibility into in the comopany's future and allowing their whole business work more proactively towards responding to other needs.

Read Diedrich's Case Study

Maximus Coffee Group struggled using an older scheduling software that was unfriendly and didn't have the functionality to meet the increasing needs of their company. See how Maximus increased their efficiency, forecast weekly schedules and cut their production scheduling time in half.

Read Maximus' Case Study

Fiber Optic Production

Sumitomo Electric Lightwaves is a recognized leader in creating cost-efficient ribbon-figured solutions, cable assembilies, and fiber management systems and fiber cabling systems. Shipment promise date accuracy improved by 8% and production level has increased by 16% as the result of PlanetTogether.

Read Sumitomo Electric Lightwaves' Case Study

Medical Devices and Instruments Production

Anspach Effort, Inc. runs an enormously complex manufacturing operation with more than 1,100 items and 2,000 concurrent orders. See how Anspach streamlined their scheduling, lowering their inventory stock by 15% and reducing overtime expenses by 20%.

Read Anspach's Case Study

Truck Equipment Production

Production scheduling for Knapheide Truck Equipment used to take two full-time employees. Their schedules were often inaccurate and inflexible, limiting the company's multi-million dollar production. See how Knapheide reduced their scheduling time to 15 minutes a day and increased both their production and their quality of service.

Read Knapheide's Case Study

Unique Production Operations

The Ancestry.com, Inc. needed a production scheduling solution customized to their specific needs of cataloging and organizing historical data. With over 1,000 of customers all over the world depending on them to archive millions of personal data, Ancestry.com spent hours hauling over spreadsheets unable to see the end dates of their projects. See how Ancestry.com reduced their scheduling time and can forecast completion dates while sharing this information to their customers worldwide.

Read Ancestry.com's Case Study